
Sewage Treatment Plant Installation in East Grinstead
2 min readEast GrinsteadBy AA Drainage
Off-mains properties around East Grinstead often choose a sewage treatment plant for cleaner discharge and more flexible siting.
Choosing the right size
Plants are sized by the number of people they serve. Bigger homes, annexes or holiday lets need larger units to treat waste properly.
Installation steps
Our installs include:
- Excavation and base preparation
- Setting the plant level and anchoring it
- Connecting inlet, outlet and power
- Building the discharge point or drainage field
- Commissioning and testing
Access for emptying
We position the plant so a tanker can reach it easily, saving hassle every time it needs emptying.
Frequently asked questions
Can it discharge to a stream?
Often yes for a treatment plant, provided the rules are met.
How long does installation take?
Usually a few days for a typical home.
